Displaying a Report's Run Time

In Bullhorn Reporting, you may want to see the time and date a report was run to be sure your recruiters are following your policy for when to run the report. The below steps will guide you through adding the date and time.

Steps

  1. From the Toolbox (wrench icon) tab, select the Textual drop down.

  2. Drag Date into the area that you want it to show
  3. Drag Time into the desired area after the Date. It should look similar to below.
  4. Run your report to view with the date/time stamp.