June 2025 Release: ATSv2 Resolved Issues

June 2025 (2025.06 GA Release - Package Version 8.84.4)

Component Error When Filtering the ATS Chevron by Stage

Only stages selected in the filter are now shown when you filter the ATS Chevron view by stage.

ATSv2 Rejection reason picklist values are not translated correctly in rejection modal window

Users reported seeing the values in the 'Reject Reason' picklist being displayed in English even if their Org was configured for a different language. This is now fixed. No configuration required.

ATS Chevron view - Sort by Stage Not Working

When using the ATS Chevron view for a jobClosed A job (vacancy, position, role) is an opening for which a customer's client needs a placement., clicking on the Stage column header to sort the results stage, as expected.

Send Out/Internal Interview End Date Does Not Update Based on Start Date

It has been fixed so that the End Date cannot precede the Start Date when you change the Start Date of a Send OutClosed The third Stage of Job application flow. This is when the recruiter sets up a job interview between Candidate and Client. or Internal InterviewClosed The third Stage of Job application flow. This is when the recruiter sets up a job interview between Candidate and Client.. For example, when changing the Start Date to tomorrow, the End Date will also update to tomorrow.

Send Out/Internal Interview End Time Is Not Adjusted Based on Duration

Now, when the Start Time is adjusted, the End Time will automatically update to reflect the Default Duration. For example, setting it to 60 minutes following the interview’s start time.

Users have the flexibility to manually override the End Time if necessary. In such instances, the Duration value will be adjusted accordingly, while the Start Time will remain unchanged. If a user modifies the default duration by manually setting the end date and time, and subsequently changes the start date and time fields, the lastly calculated duration (which is determined by the previous difference between the start and end date/time) will be respected.